Robbkontrol logo text

Explosion protection (ATEX) - Documentation preparation

Explosion protection (ATEX) plan chapter

Since 2020, the explosion protection plan chapter must appear as a separate work part in all investment plan packages where explosive materials or technology will occur. It appears in almost every area of industry and provides essential input data for the design work of almost all other disciplines, primarily for fire safety, mechanical, and electrical designers. An explosion protection plan chapter is required even at the concept level, which may be modified at the design stages of the approval and execution plans. If you intend to introduce new technology, equipment, or facilities that will involve explosive materials, please request a custom quotation for the preparation of the explosion protection plan chapter.

Applicable legislation:
  1. 54/2014. (XII. 5.) BM decree on the National Fire Protection Regulations
  2. TvMI 13.3:2022.06.13. Fire Protection Technical Guideline. Explosion protection

Request for quotation

documentation - zone classification - plan chapter

Request our quote!
By filling out the form below, you can start the quotation process. You can learn more about the next steps in the workflows section. If you provide your phone number and check the “Request a callback” box, our colleague will call you back as soon as possible.
LinkedIn logo

© Robbkontrol Ltd. 2024. All rights reserved.

Robbkontrol logo text

Our notification number: B/2020/003014